๐Wooden poles:
๐The portion 2 meters from the bottom have to buried in the ground.
๐This portion should be painted with bitumen to avoid deterioration.
๐After the erection pit should be partially filled with small pieces of bricks, stones and rammed well.
๐After that earth should be filled and ramming is done.
๐Steel tubular poles, Braced channel poles and Rails
๐A suitable pad of cement concrete, stone or steel is provided at the bottom of pit.
๐This should be done before the erection of pole.
๐A cement concrete muff extending 0.2m above the ground with a tapered top to shed the rain water is provided. ๐This is to avoid corrosion.
๐Pre-stressed and RCC Poles
๐RCC poles are of larger cross section than PCC.
๐therefore there is no need of providing base plates or muffs.
๐In case of PCC poles, a base plate concrete block is provided.