Saturday, 1 August 2020

⚡MY EXPERIENCE ON FIRST DAY OF MY INTERNSHIP IN TRANSFORMER SALES AND SERVICE COMPANY ⚡

🌠⚡ MY EXPERIENCE ON FIRST DAY OF MY INTERNSHIP IN TRANSFORMER SALES AND SERVICE COMPANY ⚡🌠

⚡today I like to share about my experience on my first day of my internship in  Transformer sales and service company in Mukka Mangalore.  since it was my first day I learnt about the basic things in transformer repairing.
👆DRY TYPE TRANSFORMER 👆

⚡ generally there are two types of transformer that is dry type transformer and then oil filled transformer.dry type transformer is generally used in the indoor where as oil Transformer Raj general used outdoors.  bilkul generally find the dry type transformer in the indoor of the building and the size requirement of the dry type transformer is very little compared to that of the oil field transformer as well as the transformer is not heavy as compared to that of the oil field transformer but there are also some disadvantage in the dry type transformer like it is a less efficient,  request more maintenance and it also provides a lesser efficiency when compared to that of the oil filled Transformers.  but the size of the dry type transformer is small compared to that of the oil field Transformer which makes in reliant to keep in IT inside the building etc.  in the date of Transformers is the oil is not present it is generally works on the basis of air circulation that is generally by means of the atmospheric air where is in the oil filled Transformer oil is used to cool the Transformer.  in the oil field Transformer it can have the capacity to take the oil of some 360 litres of oil is General required in the all feel Transformers and the petroleum companies like HP petroleum that is Hindustan Petroleum companies  by means of this company's the oil is generally transported and is distributed to the Transformer repairing  and maintenance company.  there is also special kind of wall which is generally called as Transformer oil which is generally used in the oil filled Transformers.  the Transformer oil is nothing but the also like the vegetable oil the Mineral oil can be used  in oil type transformer.  and in the oil type transformer 10 applied the oil it can last up to 7 years and in the majority of the stations they will not replace  the oil even after the period of 7 years.  the oil used in a transformer can be reused by means of the filtration process Sudhar the wastage of the all can be minimised.  at the end of the oil tanker fish generally observe we could find the small device which is generally called as Silica Gel breather aur we can call it as a small geyser.  the purpose of using the  Silica Gel breather is it absorbs the moisture that is generally present in the air before letting into the Transformer at the first stage the colour of the silica will be generated and then it turns into blue and then at last he turns into pink and finally after several years it will generally turn into white and then the Silica Gel care cannot be used this is a similar as that small packet of Silica Gel that will be generally used in the products in generally in order to absorb the water moisture.
👆OIL FILLED TRANSFORMER 👆

⚡ but really the transformer companies will generally replaced the Silica Gel breather because the cost of silica is very much that is approximately rupees thousand per kg for the high quality of Silica  and there are different  qualities of silica available.  Vikraal so observe the oil indicator level get is generally called as conservation   oil gauge  by means of this because generally get an idea as to what level the oil has to be filled in a oil filled transformer.

👆SILICA GEL AIR BREATHER WHICH IS USED TO ABSORB THE MOISTURE PRESENT IN THE AIR👆


⚡ if you generally take any Transformer the testing plays a vital role.  and totally 18 types of test are generally performed in the Transformers.  we can classify this test as high voltage test and low voltage test.

🔎LV TEST (LOW-VOLTAGE TEST) 
 ✏️ratio test 
✏️winding resistance test
✏️insulation resistance test
✏️magnetic balance test
✏️vector group test

🔎HV TEST (HIGH-VOLTAGE TEST) 
 ✏️separate source voltage test
✏️no load test open circuit test
✏️load test for short circuit test
✏️double voltage test or induced overvoltage test
✏️heat run Test
✏️impulse test partial discharge test

⚡ out of this only some tests are generally done in a transformer company and if it is a very much larger company then all the test will be generally performed in the Transformer. 
⚡in a transformer we can find either the three orders for terminal if it is a three-terminal then it generally made the delta connection and if it is a photo I am really general image that it is a star connection.  and the various problems that can occur in the Transformer are either it may be resting or winding burning problem or when we need to replace the windings,  terminal problem,  efficiency problem and more.
👆CLAMP METER WHICH IS USED TO MEASURE CURRENT WITHOUT DEACTIVATING THE SUPPLY 👆

 ⚡we can also observe the tap changing mechanism in the Transformer.  generally there may be either 5 or 7 times in a transformer.  the tabs are generally numbered as 1 2 3 4 5 6 and 7.  if I generally consider the tampon as 11000 volts,  then at tap 2 the  voltage  reduces as 10500 and at tap3 it may be 10450 Ana soon.  from this we generally understand that as we increase the tap the voltage get decreased depending on the requirement of the line we will generally adjust that happening mechanism.


 ⚡I have also learnt that for the just insulation of the copper wire,  the news nation used is the called as paper covered insulation is generally used to protect   from the heat and also for the long life.  and this paper cover the insulation is generally used to connect all the terminals of the copper wires.  if you go through tahroli in any of the transformer repairing company then we could find any instruments there like open circuit and short circuit test bench metre,  clapping metre,  digital insulation 3 phase tester,  core stacking machine,  high heat machine and generator etc.


⚡similarly in any other iron materials at the first stage we will general use a blade in order to remove the rusted paint  advance this job is done we will watch the Transformer with the soap water and later with the clean water and then we will allow it to dry for sometime.  later we will apply zinc phosphate that is generally used to protect the iron from the  Rust  and finally the paint is applied.  as I have mentioned earlier that we are using Silica Gel breather in the oil filled Transformer,  about 500 grams of silica is generally used in the breather.  and we can observe a small nozzle like hole in a breather which is generally fixed to the oil tank by means of the nut and screw arrangement.  this above-mentioned things I have general learnt in my first day of my internship in the Transformer sales and Company Limited and I'm also excited to practically do all the testing methods in the Transformers and I would I am also keen to compare the practical value with the theoretical value and learn a lot of things  in a period of 1 month. 

Tuesday, 16 June 2020

MY EXPERIENCE VISITING UPCL(UDUPI POWER SUPPLY COMPANY LIMITED)

🏙️UPCL(UDUPI POWER SUPPLY COMPANY LIMITED)🏙️



⚡Today i want to share my experience while i visited the UPCL plant in udupi near village of yellur  karnataka and I would also like to share the details i got from the guide or an employee working there.

⚡Generally i went to UPCL with my classmates previous year that is in 2019.it was the wonderful experience visiting UPCL. As a student👨‍🦲 I had a lot of thoughts and doubts I wanted to clear after visiting the UPCL. The total capacity of UPCL is 1200MW.

⚡Firstly UPCL is a🌡️ thermal power plant 🌡️or we can also say it as the coal powered plant since the main material used is coal in order to generate electricity. It generally took a month for us to get the permission from the authority of UPCL to visit as well as to have a guide to explain about working of the power plant. The power plant is located in remote area or we can call it as a village in udupi and it is owned by the most popular company called as ADANI. Which also has power plant electricity production in many other countries like Australia, India etc. Here out of 100% energy generated 90% of the power is given and used by karnataka itself and the remaining 10% of the power is given to the state of punjab. Each steam turbine is of 3000 rpm, tandem compound, single re-heat, condensing type machine with extractions for regenerative feed water heating. The turbine would be designed for main stream pressure of 170 kg/cm2 (a) and inlet temperature of 537°C. 

⚡The first thing guide told us was whenever an alarm was heard we need to be present at centre of plant that is generally during emergency conditions and the guide will tell us what steps we need to take during emergency. We all were also given safety helmets for protection. Since we went there in our own bus they insisted us to sit in the bus 🚌and guide will explain the working in each section or block in power plant. Even though we were not so happy about it but we agreed and our journey began.The site is about 28 M above MSL and falls under seismic zone III. The maximum ambient temperature is about 38°C and the annual mean relative humidity is 74-80%. The nearest seaport is at Mangalore (New Mangalore Port).UPCL generates two levels of power one is 220kv line and the other is 440kv line. Here, the 220kv line is given or is connected to kemar region where as the 440kv line is given to hassan which is some 180 kms from udupi or UPCL. 

⚡First of all the🌍 environment, garden maintenance, surrounding was quite well so the first impression it created excited us a lot than we expected.

⚡In UPCL coal is imported from Indonesia 💯since if we use coal from India we may not get the proper output or the efficiency so its better use imported coal to get more efficiency. There was wagon or train track for transportation of coal from port since the coal is imported from Indonesia through a ship🚢🛥️⛴️🛳️ and then by train.

⚡There will be unloading system of coal is done by a simple mechanism and then it is travelled to next section by a conveyer. We got an opportunity to got inside the generator, boiler section but as we know its not a transparent mechanism to observe what is generally happening inside boiler so we just we inside by climbing steps, speaking, making fun of friends etc and at top section we took a photograph with s name labelled ADANI, that too only 1 picture since the guide did not allow us to take more pictures and we were also not allowed to take a photo from our smartphone inside the power plant as we already handed our smartphone to authority.

⚡After that we were taken to controlling section where we were allowed to see the members Checking boiler temperature🌡️ and working of entire power plant and since I'm a electrical student ⚡⚡I could gradually understand the statistics of how much power is being generated, and when we visited only 1 part or the section of power plant was working because during day time solar power plant, wind power, biomass, biogas, tidal, etc can be used to generate power so its not necessary to generate more power, and depending on demand we generate⚡ electricity. UPCL mainly provides electricity during peak hours that is during night times where the power generated by 🌬️wind, solar 🌞cannot be used to that extent to run through the whole🌜 night time. 

⚡The water 🌊💧required for the power plant is obtained from the nearby sea and the sea water is not directly used by the power plant but instead a process called as desalination of sea water is generally done to remove salt content and make the water clean and pure before fedding it to the boiler. 

⚡When the coal from the conveyer is fed into furnace, after the coal is burnt the remaining product is Ash. According to the guide, he said that the Ash is generally dumped into a chamber and UPCL has made an agreement with the cement manufacturing company like ACC, DALMIA etc and the Ash is taken by these companies which will use these Ash while preparing cement. As we know that in a cement 70% it consists of Ash and only remaining 30% it consists of some other chemicals in it.

⚡The water💧🌊 coming out if the turbine is fed to condenser and from condenser it moves on to the cooling tower. I think most of people think that gas or smoke coming out as a poisonous gas but in reality it is not poisonous gas but it is just when hot water is sent to the cooling tower, it may either have a fan or may not have a fan for cooling, that fumes we mistakenly say as poisonous gas. After the water is cooled down it is fed back to the boiler by means of pump and the interesting fact is that movement of water takes place underground. Many of us were curious that what mechanisms may be present inside the cooling tower, but for our surprise its nothing but empty and it is just the construction worker who architectecs the cooking tower for cooling of water.

⚡Here, we come to the end of our journey in UPCL plant. The one question that came to my mind is about the job opportunities in UPCL plant, since at one period of time i also wanted to experience as how it would be working in a power plant and surprisingly i could not get the valued answer by the guide. Overall it was a wonderful experience of visiting to a thermal based power plant. 

⚡UPCL also has made achievements and also won several awards. 

⚡The plant has latest Pollution Control Equipment, 275 Meter High Chimney, High Efficiency ESPs, Flue gas desulphurization plant, low NOx burners, etc. to limit the SPM, SOx, NOx emissions. Greenbelt is being developed in the main plant, the corridor leading to the ash pond and around the ash pond. About 3.29 lakh saplings have been planted in and around the plant.

⚡UPCL has bagged the following recognitions🏆 awards🏆in the industry:

  • Gold Shield award🏆 for early completion of Thermal power project -Unit-1 from Ministry of power, Government of India for the year 2010-11.
  • Sustainability and EHS 🏆Awards 2012 under the following category
  • Certificate of Merit in Infrastructure /power Category –First place
  • Certificate of Excellence in Large Scale Category – Third place
  • Certificate of Commendations for its Meritorious Achievement
  • National Energy Conservation 🏆Award 2013, Ministry of Power, Govt of India
  • Best Safe Power Boiler🏅 Award 2013, Govt of Karnataka
  • CII “4 STAR” Rating for EHS Practices for the year 2013
  • First place in Infrastructure category in CII EHS 🏅Award 2013
  • CII EHS Excellence🏅 Award 2012
  • Best Fuel Efficient 🏅Award 2012, Govt of Karnataka

⚡The 1st Unit of 600 MW at UPCL was successfully tested and commissioned and commercial production commenced in November, 2010. The 2nd Unit of 600 MW was successfully tested and commissioned and commercial production was commenced in August 2012. It has also been awarded the Golden Peacock Environment Management Award in FY 2014-15.


⚡The fact that came to my mind in India 🇮🇳🇮🇳🇮🇳nowadays and in upcoming days the development and usage of renewable energy resources is given more important when compared to that of non-renewable energy resources. But we also need to remember that thermal based power plant gives a lot higher efficiency or the output when compared to that of solar, wind, tidal energy, ocean thermal energy etc.

⚡But the researchers are working on increasing the efficiency of renewable energy resources and also creating awareness in people regarding the usage of renewable energy resources like we could setup a biogas plant at home for ourselves. 

⚡In previous blog I had spoke about solar energy in karnataka as well mainly I highlighted🌞 solar energy 🌞plantation in NMPT and MRPL and I would continue to just share my experience, knowledge, facts about all⚡⚡ electrical aspects i know to the more detailed extent as possible.
👆Picture of protest that took place some years back👆

💁‍♂️ARTIFICIAL SUN CREATED BY CHINA 👈

🌞 ARTIFICIAL SUN MADE BY CHINA 🌞 ☀️China successfully powered up its “artificial sun” nuclear fusion reactor for the first ti...